Office Spaces
Today's workplaces demand flexibility, comfort and adaptability. AirFixture designs UFAD for office spaces that support changing floor plans, hybrid work environments and evolving tenant needs. By utilizing underfloor air distribution, office buildings gain a flexible HVAC solution that improves occupant comfort while making future renovations significantly easier.
UFAD for Office Spaces
Buildings which incorporate design and construction strategies to conserve resources, operate efficiently and improve the overall work environment for occupants are demanded in today's environmentally conscious built environment.
Utilizing raised access floors with underfloor service distribution maintains high-quality clean air, improves personal comfort control, attenuates noise, and responds to organizational and technological changes quickly and easily.
With Underfloor Air Distribution, you have the ability to address all of the factors required to create the perfect working environment, reflecting the goals and image of your business.
Flexible HVAC for Modern Workplaces
Office environments rarely stay the same throughout a building's lifespan. Departments grow, workstations move and collaboration spaces evolve. Traditional overhead ductwork often requires extensive demolition whenever layouts change.
UFAD provides conditioned air through a raised access floor, allowing air delivery locations to be adjusted as spaces evolve. This flexibility helps owners reduce renovation costs while maintaining comfortable indoor environments.
Additional benefits of UFAD include:
- Easier workstation reconfiguration
- Personalized comfort within occupied zones
- Improved indoor air quality through displacement ventilation principles
- Reduced ceiling congestion for open architectural designs
- Simplified access to electrical and data infrastructure beneath the floor
From corporate headquarters to multi-tenant office buildings, AirFixture helps designers create workplaces prepared for long-term change.
AirFixture is our preferred go-to expert for all solutions related to Underfloor Air Distribution. Their inputs help us with not only the design of the project but also successful execution and client satisfaction.
I’m always worried about trying something radically different in our projects. What if it doesn’t go to plan? What if there’s something we haven’t considered? Those concerns were completely unfounded with UFAD. it was far less complex, and way easier to plan and install than a traditional system.
Our Office Projects
Wells Fargo (AZ, USA)
Phoenix, Arizona
700,000 sq.ft SQ FT
Wellmark BCBS (IA, USA)
Des Moines, Iowa
600,000 SQ FT
Summit Credit Union (WI, USA)
Madison, Wisconsin
152,000 SQ FT
Koll Intellicenter (OK, USA)
Oklahoma City, Oklahoma
150,000 SQ FT
Freddie Mac (VA, USA)
McLean, Virginia
330,000 SQ FT
Disney Grand Central (CA, USA)
Glendale, California
350,000 SQ FT
Banner Bank (ID, USA)
Boise, Idaho
180,000 SQ FT
BanCaribe (Venezuela)
Caracas, Venezuela
160,000 SQ FT
AL Ain Hospital (UAE)
Al Ain City, United Arab Emirates
3,800,000 SQ FT
AL Ain Hospital American Airlines Trinity Complex (TX, USA)
Fort Worth, Texas
750,000 SQ FT
Analog Devices – Cavite Philippines
Cavite Philippines
414,000 SQ FT
Birmann 32 – Sao Paulo Brazil
Sao Paulo, Brazil
700,000 SQ FT
Chevron Midland Office (TX, USA)
Midland, Texas
400,000 SQ FT
Choctaw Nation of Oklahoma Headquarters (OK, USA)
Durant, Oklahoma
500,000 SQ FT
Schlumberger Midland Office (TX, USA)
Midland, Texas
350,000 SQ FT
Health Insurance Review & Assessment Services (HIRA) (Seoul, SK)
Seoul, South Korea
662,000 SQ FT
Korea Electric Power Corporation (KEPCO) (Seoul, SK)
Seoul, South Korea
1,100,000 SQ FT
Korea Teachers Credit Union (KCTU) (Seoul, SK)
Seoul, South Korea
898,000 SQ FT
Nissan Corporate Offices (TN, USA)
Nashville, Tennessee
500,000 SQ FT
Northwestern Energy General Office (MT, USA)
Butte, Montana
160,000 SQ FT
Partners Healthcare Administrative Campus (MA, USA)
Somerville, Massachusetts
2,000,00 SQ FT
Parc1 Tower (Seoul, SK)
Seoul, South Korea
6,780,000 SQ FT
Stryker Instruments Divisional Facility (MI, USA)
Portage, Michigan
485,000 SQ FT
ATS Warehouse (Saudi Arabia)
Riyadh, Saudi Arabia
90,000 SQ FT
Contact Our UFAD Experts!
Fill out the form today to get more information on how UFAD will help you reduce energy costs and improve air quality.